Skip Ribbon Commands
Skip to main content
Navigate Up
Sign In
Launch the Developer Dashboard

SPEAR3 Accelerator

:

AD SLACPortal > SPEAR3 Accelerator

SPEAR3

SPEAR Plot

Operator Message

The User Run, Shutdown, Accelerator Physics schedules and Machine Parameters are available through the links below.


For Updates From the BL Duty Operator, Call 926-BEAM (2326)

SLAC SLAC National Accelerator Laboratory, Menlo Park, CA
Operated by Stanford University for the U.S. Dept. of Energy